A comprehensive approach to disentangle climate and land cover change impact on water resources DECLARE
Pipeline crossing under railway track at km -19/300 - 19/400 between Poonkunnam and Guruvayur railway stations, Brahmakulam
Soil tests and design and calculation - water pipeline crossing at Kurumali Rappal road under passage, Puthukkad
Soil tests and design calculation - Jal Jeevan Mission (JJM) - 2021 - 22 - Koratty G Panchayath (Phase II) - Providing pipeline using HDD Method for crossing Railway Line at Koratty GP
Study on Pull-Out Resistance of Soil Nails for Climate- Resilient Infrastructures in Kerala Soil Conditions
Vetting of MASW & GPR test reports submitted by IIT Kharagpur conducted in Chengapalli to Walayar Section of NH544
Vetting of CTB and CTSB mix designs: Six Laning of Kadampatti (Km 517+ 250) to Kazhakootam (Km 547+080) Section of NH66