11 |
Pipeline crossing under railway track at km -19/300 - 19/400 between Poonkunnam and Guruvayur railway stations, Brahmakulam |
Civil Engineering |
Active |
|
12 |
Design Calculation - pipeline crossing railway tracks at Paluvai by HDD method |
Civil Engineering |
Active |
|
13 |
Soil tests and design and calculation - water pipeline crossing at Kurumali Rappal road under passage, Puthukkad |
Civil Engineering |
Active |
|
14 |
Soil tests and design calculation - Jal Jeevan Mission (JJM) - 2021 - 22 - Koratty G Panchayath (Phase II) - Providing pipeline using HDD Method for crossing Railway Line at Koratty GP |
Civil Engineering |
Active |
|
15 |
Vetting of MASW & GPR test reports submitted by IIT Kharagpur conducted in Chengapalli to Walayar Section of NH544 |
Civil Engineering |
Active |
|
16 |
City Gas Distribution Project Thrissur and Palakkad |
Civil Engineering |
Active |
|
17 |
Vetting of CTB and CTSB mix designs: Six Laning of Kadampatti (Km 517+ 250) to Kazhakootam (Km 547+080) Section of NH66 |
Civil Engineering |
Active |
|
18 |
Overlay Design and Rehabilitation Measures |
Civil Engineering |
Active |
|
19 |
Recommendations on slope protection works for Painav- Thannikandom - Ashokakavala road, Idukki |
Civil Engineering |
Active |
|
20 |
Checking and Vetting of Design submitted by Bekaert concrete for SFRC flooring design for FM2 at the proposed Aarush (Phase V) Logistics Park Pvt Ltd at Chennai (Madras), Tamil Nadu, for Indus floors India Pvt Ltd |
Sustainability |
Active |
|