41 |
Checking and Vetting of Design Solution for flooring of Power of one logistics park at Chakan, Talegaon submitted by Power of One Logistics Park Pvt. Limited |
Civil Engineering |
Closed |
|
42 |
Checking and Vetting of Design Solution for Warehousing Project at Aarush Logistics Park at Vallam, Oragadam submitted by Aarush (Phase II) Logistics Park Pvt. Limited |
Civil Engineering |
Closed |
|
43 |
Checking and Vetting of Design Solution for FRC Flooring of the proposed project at Chennai Submitted by ACS Technologies, Chennai |
Civil Engineering |
Closed |
|
44 |
To establish the process methods for manufacturing MS1 alloy through powder bed fusion technique and its characterization |
Mechanical Engineering |
Closed |
|
45 |
Four Laning of Thalassery - Mahe Bypass section of NH-17 from km 170+600 (Design Chainage 170+600) to km 188+000 (Design Chainage 189+200) in the State of Kerala under NHDP Phase-III on EPC Mode |
Civil Engineering |
Closed |
|
46 |
Preparation of Cross Examination Arguments and Analysis against the detailed delay and escalation report of the Contractor against IOCL's Arbitration case in connection with MULT at Puthuvypen, Cochin Port |
Civil Engineering |
Closed |
|
47 |
Preparation of Counter Argument Report for IOCL’s Arbitration case in connection with Construction of Multi- User Liquid Terminal at Puthuvypen, Cochin Port |
Civil Engineering |
Closed |
|
48 |
Technical review of the counter claims by IOCL and CoPT for arbitration of the case in connection with Construction of Multi- User liquid Terminal at Puthuvypen, Cochin port |
Civil Engineering |
Closed |
|
49 |
STP Water Testing |
Civil Engineering |
Closed |
|
50 |
Soil investigation and structural stability for Sebastian indoor stadium, Edava, Thiruvananthapuram |
Civil Engineering |
Closed |
|