71 |
Payment design for roads in Kottoor Elephant Rehabilitation Centre |
Civil Engineering |
Closed |
|
72 |
Checking and Vetting of Design Solution for flooring of Power of one logistics park at Chakan, Talegaon submitted by Power of One Logistics Park Pvt. Limited |
Civil Engineering |
Closed |
|
73 |
Checking and Vetting of Design Solution for Warehousing Project at Aarush Logistics Park at Vallam, Oragadam submitted by Aarush (Phase II) Logistics Park Pvt. Limited |
Civil Engineering |
Closed |
|
74 |
Checking and Vetting of Design Solution for FRC Flooring of the proposed project at Chennai Submitted by ACS Technologies, Chennai |
Civil Engineering |
Closed |
|
75 |
To establish the process methods for manufacturing MS1 alloy through powder bed fusion technique and its characterization |
Mechanical Engineering |
Closed |
|
76 |
Four Laning of Thalassery - Mahe Bypass section of NH-17 from km 170+600 (Design Chainage 170+600) to km 188+000 (Design Chainage 189+200) in the State of Kerala under NHDP Phase-III on EPC Mode |
Civil Engineering |
Closed |
|
77 |
Preparation of Cross Examination Arguments and Analysis against the detailed delay and escalation report of the Contractor against IOCL's Arbitration case in connection with MULT at Puthuvypen, Cochin Port |
Civil Engineering |
Closed |
|
78 |
Preparation of Counter Argument Report for IOCL’s Arbitration case in connection with Construction of Multi- User Liquid Terminal at Puthuvypen, Cochin Port |
Civil Engineering |
Closed |
|
79 |
Technical review of the counter claims by IOCL and CoPT for arbitration of the case in connection with Construction of Multi- User liquid Terminal at Puthuvypen, Cochin port |
Civil Engineering |
Closed |
|
80 |
STP Water Testing |
Civil Engineering |
Closed |
|